Monday, March 14, 2016

Condensation in Buildings - Part 2 – How to reduce the risk!



There are a few very simple, but nevertheless very effective ways we can reduce the risk of condensation, just by simply being aware of some of the activities we would normally undertake without even thinking

Source: thevideo.biz
In order to understand how to reduce the risk of condensation it is important to first understand how it occurs. If you have not already done so I would recommend reading last week’s article (Link), ‘How condensation occurs’, before going any further. You will then understand that the ‘ingredients’ necessary for condensation to occur are moisture vapour and cold surfaces, which are exacerbated by poor heating and poor ventilation.  The cold surfaces could be present due to thermally inefficient walls and surfaces, particularly in older buildings.  In fact there are a whole host of reasons why the internal surface temperature of the internal fabric of a building may be cold (walls, windows, ceilings etc.,) including poor maintenance of external walls, rising damp, penetrating damp due to leaking rainwater guttering or downpipes, leaking roofs, single glazed windows, poor weather sealing around openings and cold bridges, which are areas of the building fabric which are less thermally efficient than the surrounding construction.

To reduce the risk of condensation occurring there are two things we should consider. Firstly, dealing with the cause of the condensation and secondly, looking at the way we use a building and trying to find ways of reducing the amount of moisture vapour we emit.

In order to rectify the problem, we first need to establish the cause. This is where you may need the advice of a Building Surveyor, who will be able to undertake a thorough inspection and establish which factors or combination of factors are contributing to the condensation. This is important because if you do not deal with ALL of the contributing factors, you may slow down the amount of condensation occurring, however you will not actually solve the problem. For example you may decide to improve the heating system, but if you do not deal with the thermally inefficient walls, then all of that increased heat will just disappear through the walls, and will have a limited effect. So depending on what is established as the cause, it may be necessary to increase the internal surface temperature of the walls by either insulating internally (dry lining) or externally (insulated render system), replacing windows, improving ventilation (possible a mechanical extractor fan) and upgrading the heating system. As you would imagine, this could become very expensive, which highlights why you may need the advice of a professional to ensure that the correct remedial measures are undertaken. All buildings are different and the way we use buildings will also be different, therefore we cannot assume that the cause of condensation and the remedial works required will be the same in every situation.

After dealing with the building we must also consider ways in which we can reduce the amount of moisture vapour we emit in buildings.   There are a few very simple, but nevertheless very effective ways we can achieve this, just by simply being aware of some of the activities we would normally undertake without even thinking.

Source: www.prokil.co.uk
Bathing, washing and cooking are activities that we cannot avoid however all produce large amounts of moisture vapour. We must undertake these activities on a day to day basis, however when showering/bathing, try to not leave the shower or bath taps running more than you need, switch them off as soon as you can.  If you have extractor fans, ensure that they are working, adequately sized and switched on when needed. Although it may be cold outside, when you are leaving the bathroom, open the window to let fresh air in, which will soon clear the moisture vapour and prevent it condensing on the walls and windows.

If you are using a tumble dryer ensure that it is vented to the outside.  I have undertaken a number of previous inspections where I have seen the flexible tumble dryer vents extracting into a room, rather than outside.  This was due to in both cases to lack of thought of the location of the tumble dryer and a general lack of understanding on the part of the occupiers. Also, when drying clothes try to avoid placing them on top of radiators.  This is usually done for convenience, however again produces large amounts of moisture vapour.  Whenever possible washing should be dried outside, or if weather conditions do not permit this then consider using an appropriately vented tumble dryer, or maybe a trip to the launderette.

When cooking use an extractor hood if you have one above your cooker and keep lids on saucepans as much as you can.  Avoid using bottled gas and paraffin heaters these produce large amounts of moisture vapour. 

Finally, but very importantly, try to ensure you have a regular flow of fresh air around your house/buildings.  This effectively dries out any moisture vapour and prevents it reaching concentration levels where condensation may become an issue.  Granted, nobody wants to release all of that lovely heat from a building in the depths of winter, however, opening windows for a short period of time may result in the internal environment becoming temporarily cooler, but it will also significantly help to reduce the risk of condensation.

Hopefully, now that you know how condensation occurs you can start to thing about ways in which you can help to reduce the risk.  In future articles I will discuss other forms of damp in buildings such as rising damp and penetrating damp.

Please feel free to share this article and other articles on this site with friends, family and colleagues who you think would be interested

Information/opinions posted on this site are the personal views of the author and should not be relied upon by any person or any third party without first seeking further professional advice. Also, please scroll down and read the copyright notice at the end of the blog.

Monday, March 7, 2016

Condensation in Buildings - Part 1 – How it occurs



If left untreated condensation can become a significant problem so it is important that people understand how it occurs and how to deal with it.  Due to the fact that condensation produces water/moisture it can also act as a catalyst for a number of other defects that can be found in buildings

Source: www.biocraft.co.uk
Most people will have seen damp in their homes in one form or another, and in fact damp is one of the most common problems encountered in houses.  Damp can manifest itself in a number of ways including ‘wet patches’ on surfaces, mould growth and sometimes a musty smell.  If left untreated damp can lead to deterioration of internal surfaces and finishes, provide a very unsightly appearance and in certain circumstances lead to health problems, particularly for vulnerable user groups such as the elderly, young children and those with respiratory conditions such as asthma. There are a number of different types of damp that can occur in buildings including rising damp and penetrating damp, however for the purposes of this article I want to focus on condensation.

In order to understand how we can deal with condensation it is important to first understand how it occurs.  All air contains a certain amount of ‘invisible’ water vapour.  You may not realise it, but as a human beings we are emitting water vapour constantly, you may not see it but it really is happening. Water vapour is also emitted by the activities we undertake in the home including washing, cooking, drying clothes, using portable heaters such as calor gas etc.  Basically, there are large volumes of water vapour being emitted in your home and the amount of water vapour that is emitted is determined by the activites that we carry out and the number of people in your house at any particular time.  Condensation occurs when this water vapour comes into contact with cold surfaces and the air no longer has the capacity to hold any more water vapour.  In order to understand this we need to first understand relative humidity, which is a generally poorly understood term.


Source:m.google.com
Relative humidity relates to the actual water vapour present in air to that which could be present and is routinely expressed as a percentage. The reason we refer to ‘relative’ humidity is because air has a varying ability to hold moisture vapour depending on temperature.  Warm air can hold more water vapour than cold air.  Once relative humidity reaches 100% it no longer has the ability to hold any more water vapour and it will start to condense on cooler surfaces (something referred to as ‘Dew Point’), which is the physical change into a liquid (condensation).

As an example, think about your bathroom.  When you have a bath or shower large quantities of water vapour are produced.  Sometimes this will develop into a ‘fog’ in the room until you open the window or turn on an extractor fan.  Have you ever noticed that you get water developing on your windows and walls?  This is condensation.  Have you ever wondered why this happens more readily on cold days, and in the warmer months it is hardly noticeable?  This is because the air in your bathroom on colder days has less capacity to hold moisture than the air in your bathroom during warmer temperatures (remember warm air can hold more water vapour than cold air).  Windows, particularly in older buildings are generally less thermally efficient than the surrounding structure such as the walls.  Therefore the internal surface temperature of the windows will be a few degrees cooler than the surface temperature of the walls.  This will mean that once dew point occurs (100% relative humidity), it will start to condense on the cooler surfaces first, i.e the windows, before it starts to condense on the surrounding walls.

Condensation can occur in any room in a house or within the structure of a house (interstitial condensation), including roof and floor voids, basically anywhere, where there is water vapour and cold surfaces.  If left untreated condensation can become a significant problem so it is important that people understand how it occurs and how to deal with it.  Due to the fact that condensation produces water/moisture it can also act as a catalyst for a number of other defects that can be found in buildings, namely timber decay such as wet rot or dry rot, as well as causing mould growth and potential health problems.

You do not need to be a damp specialist or building surveyor to be able to deal with condensation or at least reduce the risk of it occurring.  There are numerous products on the market that claim to reduce or remove the risk of condensation in homes including paints and sprays.  These types of products may temporarily remove condensation mould that may have already occurred, or cover over damp mould, however the only certain way of removing the risk of condensation is to understand the root cause, which will vary from building to building, and to rectify these root causes.  The usual factors that result in condensation are poor thermal insulation, inadequate heating and inadequate ventilation, or a combination of these.  In the next article I will explain how you can reduce the possibility of condensation in your home and if you already have problems with condensation I will tell you how to deal with it.

Please feel free to share this article and other articles on this site with friends, family and colleagues who you think would be interested

Information/opinions posted on this site are the personal views of the author and should not be relied upon by any person or any third party without first seeking further professional advice. Also, please scroll down and read the copyright notice at the end of the blog.

Sunday, February 28, 2016

The Use of Timber in UK House Construction - A short history



Timber has proved itself to be an adaptable and flexible material throughout history, and with the ability to replenish the wood that we use, there is nothing to suggest that its popularity will reduce

Source: http://www.gallica.co.uk/
Timber is a lightweight, adaptable and recyclable material that has been used in construction in the UK for many thousands of years.  The use of timber for construction can be traced back over 3000 years to the Celts who constructed quite simple, but nevertheless effective 'round houses', which provided shelter and security albeit at a rather basic level. The image on the right shows a roundhouse under construction. As the years moved on the use of timber became more widespread with the Romans, the Anglo Saxons and the Vikings using and adapting timber to create larger and more expansive buildings. 

Take the Romans for example - most would associate Roman buildings as large masonry constructed villas, with painted plastered walls, mosaic floors and running water etc., because when a film or documentary about the Romans is broadcast, this is what is usually portrayed. It is difficult not to admire the skills and ingenuity of the Romans based upon the many wonderful examples of Roman buildings still in existence in the UK and around the world, however these larger masonry structures were inhabited primarily by the rich and powerful, and the reality was that most Romans lived in timber constructed buildings similar to the Celts who preceded them.

Source: Google Images
The Anglo Saxons (c. 420AD to 700AD) and the Vikings (c. 700AD to 1000AD) who followed the Romans, made further use of the vast amount of available timber in the UK and began moving away from the familiar round houses and started to construct square and oblong shaped houses, with some larger ones incorporating a small number of rooms. The Vikings started to increase the length of their houses to incorporate larger internal areas and these became know as 'longhouses'. Many Viking houses were also constructed partly below ground level and although this would require a high level of hand digging, it made the house much more comfortable when completed as it protected the internal environment from draft and cold, particularly in the often harsh weather conditions in the depths of winter.

The Medieval Period followed the Viking occupation of the UK, this period in history famously started following the Battle of Hastings in 1066 (Norman King Harold, arrow in the eye and the bayeux tapestry and all that!) and lasted to c.1500 AD.  In the early part of the Medieval Period, timber was used to construct houses, but more closely followed the square oblong shape of the Anglo Saxons, rather that the Viking longhouses.  As the Medieval period developed timber frame construction evolved, with the main structure of the building being completed and then the walls would be infilled around the frame with a technique know as 'wattle and daub'. This was a method of weaving small branches between parts of the timber frame and then 'plastering' onto the weaved branches a mixture of clay, horse hair and sometimes horse dung (yuck!), with water,  This could be smoothed when wet and when it dries out it provided an effective wall finish that would be reasonably weather tight. The short video below gives an example of wattle and daub construction.



Source: Google Images
There are many wonderful examples of medieval buildings in the UK, where the timber frame construction can be seen. Large timber members fixed together with a combination of timber joints and timber pegs allowed construction to be much larger and bolder.  Houses started to incorporate timber framed windows and pitched roofs that commenced mainly as thatch, but eventually incorporated a clay tiled finish.

Timber continued to be used in construction, although masonry started to become much more extensively used during the Georgian, Victorian and Edwardian era for the main structure of a dwelling.  In the 'modern era', timber construction has made somewhat of a comeback with timber frame construction fast becoming the preferred method for many developers.

In conclusion, timber has proved itself to be an adaptable and flexible material throughout history, and with the ability to replenish the wood that we use, there is nothing to suggest that its popularity will wane.  On the flip side, timber is also vulnerable in certain conditions to decay and this needs to be carefully considered when using timber in construction and when a building is in use and this is a topic I will cover in further detail in future postings.

Please feel free to share this article and other articles on this site with friends, family and colleagues who you think would be interested

Information/opinions posted on this site are the personal views of the author and should not be relied upon by any person or any third party without first seeking further professional advice. Also, please scroll down and read the copyright notice at the end of the blog. 

Monday, February 22, 2016

Party Wall etc. Act 1996 - It's my party and I'll comply if I want to (or so some think!)



The main purpose of the Party Wall etc. Act is to prevent and resolve disputes, however many of my appointments under the Act occurred when a dispute arose after works had commenced


Source: www.party-walls-leicestershire.com
Anyone who deals with law will know that reading legislation can often be cumbersome, time consuming and sometimes difficult to understand and interpret.  This is not the case however with the Party Wall etc. Act 1996 (Link) which is one of the less detailed, but most prescriptive pieces of legislation that you could hope to read.   The guidance (link above) from the Department of Communities and Local Government, describes the purpose of the Act as 'providing a framework for preventing and resolving disputes in relation to party walls, boundary walls and excavations near neighbouring buildings'.

The amount of Building Owners (a term used under the Act to describe the party who is undertaking the work), who choose to ignore the Act, whether through ignorance (which is no defence in law!) or a genuine desire to cut corners to save on time and expense, never ceases to amaze me. If the main purpose of the Act is to prevent and resolve disputes it seems a contradiction in terms that many of my appointments under the Party Wall Act were usually made when a dispute had already occurred! (at this stage the dispute was in general terms and not a Party Wall dispute). The scenario below from a few years ago was posted on the Building Magazine Forum is typical of situations that I have been appointed to deal with on numerous occasions. The posting is published exactly as it was written by the person who posted it, so the grammar is not perfect;

Source: www.architectcheltenham.co.uk
‘Have lived in current house for 4 years, it's a semi and the other half changed hands last year. New neighbour promptly guts house, relocates bathroom from side of property to rear. Digs deep holes in garden for sewerage but doesn't fill holes in. Moves into home in November.

January applies for planning for two storey side extension, single back extension and front porch. This would take it from 3 beds to 5 beds! Planners refuse but give permission on second application on scaled down side extension with only an a increase to 4 beds. He started 'official' work in April just after receiving permission however had dug front porch foundations before Christmas along with making the 'sewer' holes out the back into bigger foundation shaped holes!

Now my problem. His rear foundations are several feet below my land and right against my fence which is approx a foot from my conservatory. Yesterday I noticed that in fence is leaning and on inspecting it I discover it's floating! as the land my side has started to fall into his excavations. This is happening along about ten foot of the fence starting at the house. He has tied rope to the fence to try to hold it up right but it's not working.

Looking down from an above window I can see gaps appearing in the lead flashing of my conservatory on that side so am worried that his deep excavations, which have been open for some nine months, are damaging my property. First step will be to speak with him but what should I be asking he do? Do I need a Surveyor to check there is no damage?

Also the front porch he's built was supposed to be a lean to roof but he's built it as a ridge roof and water is now pouring onto my house and land. I've spoken to him about this and he plans to put guttering up 'sometime'. 

Can he just change his plans like this’? 

Anyone who is affected by a 'Building Owner's' work as described above, where Party Wall Notices should have been issued, but have not, cannot claim any benefits under the Act, because the provisions within the Act cannot be utilised until correct notification has been issued (the Act is then initialised).  Below is the response I posted to the above scenario:

‘I agree that the Party Wall etc. Act should apply, and your neighbour obviously has not notified you. Seek the advice of a Surveyor immediately. If your property is being significantly affected in the way you suggest then the work next door needs to be stopped immediately and possibly temporary support of your property may need to be undertaken.

If your neighbour refuses to stop work, then you can apply for a County Court injunction to enforce this. Once works are stopped your neighbour should then issue Party Wall notification, for which you will have a number of options. One such option will be that you dissent (do not agree) with the works and in which case you have the option to appoint your own surveyor, who's 'reasonable fees' must be met by your neighbour.

Your surveyor will then work with your neighbour's surveyor and agree a Party Wall Award which will include details about how the works should be completed and what should be done to rectify any damage. The award will be agreed before works re-commence and will give you the comfort of knowing that the works will be completed appropriately and if any damage is caused it will be dealt with.

There is an option for you to select an 'Agreed' surveyor, who will act impartially for you and your neighbour, however when I have been called in, in situation like this I often found that relationships between neighbours had become soured and they wanted to appoint separate surveyors.

I would advise you to contact a surveyor immediately who deals with Party Wall issues, who will go through the procedure with you and hopefully explain the above in more detail’.

My response focused on the Party Wall issues, however there is also a possible breach of planning permission in respect of the porch roof that would need to be investigated. Also, if  the building work is well advanced then retrospective issuing of notices may have a limited effect.  In this scenario a neighbour can always decide to exercise their common law rights, possibly in negligence, trespass, nuisance etc, depending on the circumstances of individual cases.

In conclusion there appears to be a general lack of awareness of the Party Wall etc. Act and it's requirements by members of the public (and their advisers) which through lack of publicity, poor advice or genuine ignorance is not acceptable.  Legislation does not provide a choice, it must be complied with and those who fail to do this must be prepared to face the consequences, so be warned!

Please feel free to share this article and other articles on this site with friends, family and colleagues who you think would be interested

Information/opinions posted on this site are the personal views of the author and should not be relied upon by any person or any third party without first seeking further professional advice. Also, please scroll down and read the copyright notice at the end of the blog.

Sunday, February 14, 2016

Permitted development rights disregard rights of light



Permitted development rights take no account of a neighbour's 'rights to light'

Source: www.jcadesigns.co.uk
The UK planning system allows certain types of development to be made without the need to apply to your Local Authority for planning permission; this is referred to as 'Permitted Development'. Information relating to permitted development can be found on-line on the Planning Portal (Link). Planning applications often require professional advice in order to produce drawings, submit the application in the correct format, liaise with the Local Authority, all of which, in addition to the planning fee itself can prove to be expensive.  There is also the possibility that the application may receive objections from neighbours/local residents, which will be taken into account by the Local Authority when making a decision on the application. All of this expense stress and uncertainty can be avoided if the development is deemed to be 'permitted development'.

Whilst the advantages are clear for the party who proposes to undertake a project under permitted development, but what about the rights of adjoining owners who may be affected in some way by the proposed development?  For example, take a single storey side extension to a semi-detached dwelling.  The extension will be only 1.5 metres from the neighbour’s external wall (not the boundary), however the height of the extension will be 2.8 metres at the eaves (the junction of the top of the wall and roof).  Even though a new extension will impact on the available light to the neighbour’s kitchen windows, this is still classified as permitted development. The photograph below shows the new extension on the left hand side.

Source: own
Permitted development rights take no account of a neighbour's 'rights to light'. Therefore it is currently acceptable under UK planning laws for a development that does not require planning permission (as it may be permitted development) and is therefore deemed as acceptable, to adversely affect the right of an adjoining owner. This surely cannot be acceptable. Any adjoining owner who is affected in this way will receive little help or guidance from the Local Authority because as far as they are concerned this is permitted development and there is nothing they will do apart from unhelpfully tell you to complain to the Secretary of State (this is what happened to me a few years ago). 

All is not completely lost however, as there is a law that may provide a way of challenging 'loss of light' and that is the Prescription Act 1832.  If a new building/structure limits or reduces the amount of light available through windows and when measured the level of light falls outside 'acceptable levels', this could then be deemed to be an obstruction. If this is the case then you may be able to take legal action against the party who created that obstruction.

If you think you may have a case in respect of the above you must first think very carefully and weigh up the possible benefits of starting legal proceedings.  Do not be under the impression that if you are successful that your neighbour will be required to remove or make significant alterations to their development.  This is only likely to happen in extreme circumstances where the new building or structure has been constructed outside the requirements of permitted development, or has breached other statutory requirements.  The general outcome of cases of this nature is that the development will remain and the court may apportion a certain level of compensation for the general reduction of light.

In conclusion, in certain circumstances permitted development appears to disregard the rights of adjoining owners, and at present there is very little that can be done to stop this happening.  In a 'free' society like the UK this does seem to be unacceptable, and maybe it is now time for permitted development guidelines to be amended to close this loop hole.

Please feel free to share this article and other articles on this site with friends, family and colleagues who you think would be interested

Information/opinions posted on this site are the personal views of the author and should not be relied upon by any person or any third party without first seeking further professional advice. Also, please scroll down and read the copyright notice at the end of the blog. 

Monday, February 8, 2016

The Reality of Framework Agreements - Have You Been Framed?



Frameworks are generally poorly understood by Clients and are often not the lucrative cash stream that they initially suggest, unless of course you are one of the chosen few!

Source: www.zemaitis-uk.com
Under EU legislation all contracts from the public sector which are valued above a certain threshold (Link) must be published in the Official Journal of the European Union (OJEU, formerly OJEC). Many OJEU's advertise framework opportunities, and whilst working in Professional Practice, particularly as a Senior Manager I was often involved in preparing framework consultancy submissions.  

A framework agreement is essentially an ‘umbrella agreement’ which sets out the terms under which individual contracts (call-off's) can be made throughout the period of the agreement. Frameworks can vary in duration, however these are typically for a four year period. The principle of a framework is to establish and develop long term relationships between Clients, Consultants and Contractors etc. and to work together to achieve continuous improvement. This is measured in different ways, however the overriding objectives would be to improve quality, look for efficiencies and at the same time reduce costs.

An invitation to submit for a framework will only be given once the Client is satisfied that the Contractor or Consultant have the track record and resources needed.  This will be established from information submitted in a Pre-Qualification Questionnaire (PQQ).  The main submission will then require a whole host of different information relating to details of relevant projects, an organisational structure highlighting key personnel, health & safety policy and record, environmental credentials, numerous answers to all sorts of different questions and scenarios and obviously fees that will be charged. After assessment of the documentation and if successful, the Contractor or Consultant will be invited to an interview where eventually the Client will select a number (typically 4 to 6) to appoint to the framework.

Source: www.linkedin.com
Anyone who has prepared documentation for a framework submission, whether as a Contractor or a Consultant will be aware of how much work is involved. Typically, it will take a Senior Manager with administrative support a significant amount of time to pull the information discussed above, together.  When you consider the hourly rate of a Senior Manager and support staff, together with the bulky printing (if needed) and preparation of the documentation, the whole exercise is a real cost to a business, and is completed on the principle that if successful, there will be a continuous flow of projects for the duration of the framework.  This however is rarely the outcome.

The initial euphoria of receiving confirmation of an appointment to a framework is often quickly tempered with frustration.  In reality what tends to happen is that a Client will call off work disproportionately, with some on the framework being allocated a high percentage of projects and others being allocated very little. One factor that may contribute to this is the mandatory nature of the OJEU procedure which many Clients do not really want.  Having this procedure imposed on them means that they can no longer just invite those Contractors and Consultants who they have probably worked with for many years to tender for the framework, in fact by advertising through OJEU they are actually inviting submissions from all over the Europe Union, not just the UK.  Obviously, these 'familiar' Contractors and Consultants can tender for the framework, but will have to go through the same selection criteria as everyone else who applies.

I can think of a number of examples where my company (Property Consultants), were appointed onto frameworks, having attended numerous meetings, passed the submission and selection procedure, and then not given anywhere near the volume of work to justify the costs.  Clients do not always appreciate that part of the fee calculation is based upon the likely value of work that will be allocated through the framework. Therefore, a much more competitive fee can be included if projects of a reasonable value are called off to your company or organisation. Clients who 'throw you the scraps from the table', by allocating the odd small project here and there, do not appreciate that the fee that has been submitted will not work for this extremely low volume of work, however the fee is expected to honoured because this is what was tendered with the original submission.

There are two particular frameworks which come to mind, one with a Local Authority in the Midlands and one with a Housing Group in the North West, where my company were appointed onto the Framework, and when attending monthly framework meetings (which again is another cost to the business), it was clear that bulk of projects were being called off to the Consultants who had worked with the Client for many years. This was totally unacceptable, and despite some 'honest and frank' discussions with the Client, nothing changed. I am sure that this will be the same in certain situations for Contractors.  Consequently, my company took a commercial decision to be much more selective of which frameworks to apply for in the future.  
  
Frameworks are generally poorly understood by Clients and are often not the lucrative cash stream that they initially suggest, unless of course you are one of the chosen few!

Please feel free to share this article and other articles on this site with friends, family and colleagues who you think would be interested

Information/opinions posted on this site are the personal views of the author and should not be relied upon by any person or any third party without first seeking further professional advice. Also, please scroll down and read the copyright notice at the end of the blog. 

Wednesday, February 3, 2016

Women in Construction Symposium - Wednesday 10th February 2016 - Coventry University



Women in Construction Symposium - Coventry University 10th February 2016.- Please see below for further details and registration.

For ticket availability and information please contact carl.mills@coventry.ac.uk or Adelina Manea ab3283@coventry.ac.uk

For it's inaugural year this event is free!