Source: Black Cat Building Surveys Ltd |
If you are currently planning for a stock condition survey or maybe you already have one in progress, then there are many different things you need to consider in order to try to ensure that the data collected and indeed the outputs are actually what you intend. I can think of numerous examples where Clients have had difficulty in managing/coping with the vast amount of data that is produced, and once received, they were not exactly sure what to do with it. Over recent years, technology has gone some way to addressing this as data can be collected and collated in ‘real time’ and there are a range of ‘off the shelf’ software packages that will analyse the data and produce all sorts of reports and charts, which are useful as long as the Client knows their output requirements. Therefore, a successful stock survey requires many months of planning and organising. From a Client organisation perspective there needs to be well organised strategic approach establishing precisely what is required and importantly how this will be achieved. The information below identifies some key issues which should be considered:
Source: Homebuying Guide |
I remember one particular organisation I was advising, a Local Authority, who required a stock condition survey for their commercial building stock. This included a range of buildings such as community centres, libraries, leisure centres, offices and numerous other public buildings. In total this amounted to approximately 400 different buildings, so not a large stock survey, but challenging due to the diversity of the building stock. I became involved at a very early stage and it soon became clear that there were differences of opinion in respect of what was required to be achieved within the client organisation itself. One particular senior manager was insistent that the data collected should be used for strategic asset planning and also to assist much lower cost day to day maintenance. This manager was adamant that the survey should record things like door handles, hinges, taps, plugs, sealant etc. therefore taking the required attributes to a ‘micro level’. I highlighted the consequences of this approach in terms of the high cost of each survey due to the amount of time the surveyor would be on site, the difficulty in consistency of recorded information if you provide surveyors with too many choices, and also the limitations of the hardware at the time. In the end I was able to steer this particular client down a much more sensible road however this demonstrates some of the challenges that may be encountered, through lack of understanding and differences of opinion.
Choosing the right people - Many Client organisations will not have the skills and resources available in-house and will therefore use external consultants for delivery of stock condition surveys due to their scale and complexity. The choice of consultant is fundamentally important to the success of the survey and clients should be very thorough in their selection and procurement processes. Many consultants advertise their experience and skills in delivery of stock condition surveys, however there are some important factors that should be considered when selecting consultants for this type of work:
Resources – Based upon what you have detailed in your brief, what resources will the consultant provide to the project to ensure that the data collected will be appropriate and consistent and also achieve the deadline that you have set? It is important to find out precisely who will be carrying out the surveys (ask for CV’s), and who will be responsible for managing/overseeing the survey. Consultants will usually calculate their fee based upon the amount of time they are likely to spend on the project and the level of staff that will be needed. For large stock surveys what tends to happen is that less experienced staff (newly qualified, or those undertaking professional qualification such as APC), are used for the bulk of the surveys and a more senior member of staff is used to oversee the project. This can work as long as the senior member of staff, undertakes robust quality assurance checks of the data being collected and undertakes continual training throughout the process with the surveyors to try to achieve consistency. The whole process can easily break down if a Consultant does not manage the process in this way and will lead to incorrect/inconsistent data being collected. This should never be allowed to happen and is something that a Client should explore during the procurement process.
Procurement – All Clients will have a budget available for a stock survey and in fact this is something that helps define the scope of the survey. If you want a Consultant to understand what you require, and you want a fee that is reflective of the services that they will provide then you must ensure that your brief is suitably detailed and clear. This probably sounds obvious, however I have prepared endless tenders for many different types of work, where the briefs provided are so vague or poorly written that it is difficult to understand exactly what the Client is looking for making reflective fee calculations very difficult.
Prior to tendering for the ‘main’ stock survey, my advice would be to invite a number of Consultants to tender for a ‘pilot survey’. This will enable each Consultant to demonstrate their resources and capabilities for a small number of surveys, as well as finding out what works, or maybe does not work, before ploughing on with the bulk of the surveys. This exercise could form the first part of the selection process, which should also be preceded by Consultant interviews. This may sound like a lengthy process; however, it is extremely important to appoint the right Consultant. This approach may well reduce the possibility of serious issues arising either during the survey process or when you come to rely on the data that has been collected.
Consultant’s Fee – Always analyse precisely what the Consultant has included with their fee. If your tender documentation, including your survey brief are sufficiently detailed then the Consultant should have provided a fee to reflect what you have asked for. If not, and the Consultant has included their own ‘inclusions or interpretations’ then this will make the fee very difficult to compare with other tenders. This should not happen, as this could invalidate a tender, depending upon the method in which tenders were issued. In any event there needs to be a detailed tender analysis in order for a Client to satisfy themselves that the Consultant can provide precisely what they want for the fee they have provided. Never be tempted to look at the headline fee alone, as without looking you cannot know what (or what is not) included within that fee.
In my next article I will consider stock condition surveys from a Consultant’s viewpoint and provide some examples of how I used to manage large stock surveys.
Author: Gary O’Neill
Please feel free to share this article and other articles on this site with friends, family and colleagues who you think would be interested
Information/opinions posted on this site are the personal views of the author and should not be relied upon by any person or any third party without first seeking further professional advice. Also, please scroll down and read the copyright notice at the end of the blog.
No comments: